Friday, November 20, 2009
Work Back on at 713 43rd
After a Stop Work Order was issued on October 5th, 2009 for working without a permit, we had about six weeks of a lonely crane sitting on top of the building. Now that the SWO has been rescinded, it seems that everyone is ready to get going. Or, at least, the gates are open and materials are waiting.
During the six week no-work period, the graffiti on the neighboring structure has been building up. Farther down the street, another house is for sale and the demo/construction of the oversized lot at 765 has been in-process since their SWO was rescinded. It will be an 8-unit dwelling. A nice balance to this 10-unit dwelling. Bookends, really.
Labels:
11220,
11232,
43rd Street,
new construction,
stop work order,
Sunset Park
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment